Moving plumbing for remodels
Relocating supply and drain lines when the new layout does not match the old one.
Moving plumbing for remodels, and rough-ins for additions and new builds. We work to your contractor’s schedule, not ours.
Relocating supply and drain lines when the new layout does not match the old one.
Full plumbing for a gut reno, from rough-in through to final fixture set.
New sink locations, dishwasher lines, fridge lines and island plumbing done to code.
Additions, basements and new builds, roughed in on schedule and ready for inspection.
General contractors across the GTA use us for new build rough-ins. We turn up when we said we would.
The last stage, done properly, so the job you spent months on does not leak in year one.
In a renovation, plumbing is the constraint everything else bends around. Where the drain can go determines where the toilet goes. Venting decides whether an island sink is straightforward or a problem. Getting a plumber involved when the layout is still on paper saves far more than it costs — because the expensive version of this conversation happens after the floor is open.
Drains need fall and venting. Moving a toilet a few feet is often simple; moving it across the room can mean opening the floor and rerouting the stack. Worth knowing before the tile is ordered, not after.
Plumbing runs in two stages, and the first one happens before the walls close. Book the rough-in late and the whole schedule behind it slips.
It is not. There is no wall to vent into, so it needs a specific venting solution to drain properly and stay code-compliant. Very doable — just not the same job.
Renovation plumbing that moves drains or adds fixtures generally needs a permit and inspection. Doing it properly protects your resale and your insurance. Doing it quietly does neither.
Bring us in while the layout is still on paper. We will tell you what is straightforward, what is expensive, and where a small change saves real money.
We turn up in our window, rough in to code, and leave it ready for inspection so the trade behind us is not waiting.
Final fixture set at the end, tested properly. The stage where a rushed job announces itself two years later.
From rough-ins to final fixtures, we complete renovation plumbing to the highest standard.
Milton • Oakville • Burlington • Mississauga • Hamilton • Toronto • Etobicoke • Halton Hills • Georgetown • Waterdown
Yes, regularly. Contractors across the GTA use us for new build and renovation rough-ins. We work to your schedule and we do not hold up the trades behind us.
As early as possible for planning, and firmly booked for the rough-in before the walls close. The layout conversation is worth having while it is still on paper.
Usually yes, though how involved it is depends on drain fall and venting. A short move is often simple. A move across the room can mean opening the floor. We will tell you which before you commit.
If you are moving drains or adding fixtures, generally yes. We will tell you what the job needs and make sure the rough-in is ready for inspection.